US$ 12750.00
The Rail Tracker cleaning tool actually follows the track and hugs the rail while you clean
This controller is also fitted with a Brake Simulator which allows the user to apply the brake to slow the locomotive down without altering the throttle
Built up this measures 90mm x 140mm x 225mm
A suitable Plastic Cement Glue is required to complete this kit
Signal Details:
7D-011-005 Streamlined Railcar W8W BR Lined Carmine & Cream Diesel Locomotive Building-Sheets The Rail Tracker cleaning toolThe first diesel railcar was introduced by the GWR in 1933. The innovation was to prove extremely successful and they continued in operation well into the 1960s when their use was eclipsed by the introduction of the BR first generation DMUs. The railcars art deco air smoothed styling has lead to their nickname of Flying Banana although later variants were produced to a more angular style. In all 38 GWR diesel railcars were produced from 1933 to 1942
US$ 12750.00
US$ 15500.00
US$ 9360.00
US$ 27400.00
US$ 33250.00
US$ 29000.00
US$ 18.99
US$ 6885.00
US$ 29000.00